hawera_high

Hawera High School

New electrical and data infrastructure
urenui

Urenui Water Mains

Installation of watermain in Urenui as per attached drawings
duct_installation

Duct Installation Stage 2 Tukapa/Borrell to Moturoa Substation New Plymouth

Supply and installation of ducts as per Carrington-Moturoa 33kV Cable – Option 1 (Drawing RZ033000-EEE-DG-0102 ) from the intersection of…

Contact Us

  • Drillco Limited
    64 Katere Road, New Plymouth

  • 06 758 4143

Copyright © 2019, Drillco - All Rights Reserved. Policies. Web: About Image