New electrical and data infrastructure

Urenui Water Mains
Installation of watermain in Urenui as per attached drawings

Duct Installation Stage 2 Tukapa/Borrell to Moturoa Substation New Plymouth
Supply and installation of ducts as per Carrington-Moturoa 33kV Cable – Option 1 (Drawing RZ033000-EEE-DG-0102 ) from the intersection of…